Market introduction of the DENS Power generators

The first 25kW generator will be finished

Investments BOM and BSF

DENS raises investments of 550.000 euros from BOM and BSF (Brabant Start-up Fund). With this money the we can finalize the development of the first 2 kw and 25 kw power generator.

Finishing the X2 prototype

The first version of the X2 prototype which delivers 2 Kw is ready to be tested. DENS continues to the development of a generator that produces 25 kw, which will be commercially available.

DENS founded

Key members of Team FAST are taking the next step by bringing this technology to market by starting DENS.  DENS’ reformer technology can eventually replace all combustion engines and can be applied in a wide range of industries. Initially, we focus on developing and building stationary power generators.

A formic acid generator

Team FAST tests the formic acid to power generator for the first time out-door during the reconstruction of the N211 together with the BAM.

Bus concept

Team FAST presents the concept of a 12m VDL bus driving on formic acid. The team never drove the bus while charging since the system was not ready for mobile operation. Later the system was applied stationary during a pilot with the BAM.

Formauto Junior

Six months after Team FAST started, they presented a 1-meter car driving on FA with an output of 25 W.

Team FAST foundation founded

Eight of the students from the Honors program founded the student team, Team FAST. Team FAST’s mission: Show the world know this technology on large scale!

First proof of concept

In 2015, ten students were sparked by nature’s way of capturing the power of the sun with solely water and carbon dioxide. That’s why they formed a team to explore a new energy carrier in which power can be captured: FA. Ten students built a 600 mW car driving on formic acid during their honours project at Eindhoven University of Technology.