Active in 10+ countries worldwide
Energizing 30+ companies

A brief breakdown of our journey so far

MILESTONES

2024
DENS-iintegrated-battery

2024, october

100th integrated battery for RELLY mini loader

DENS powertrain - integrated batteries

2024, february

Expansion of product portfolio with powertrains

We are proud to add integrated batteries to our line of energy solutions.

2023, june

New DENS office at Automotive Campus

Further enhancing their presence and collaboration within the automotive industry ecosystem.

The world’s largest mobile battery system commissioned on an emission-free construction site in Breda

2023 • May

Biggest mobile battery in the world delivered

DENS delivers the world’s largest mobile battery system, with a staggering 2.32 MWh capacity.

2023 • January

Production line battery systems ready

In just a few months from design to production of the world’s largest mobile battery system.

2022 • January

Start of series production

During 2022 preparations are made to start serieproduction of the 25kW Hydrozine generator.

2020 • December

Market introduction of the DENS power generator

First pilot series were introduced to the market.

2019 • December

Finishing the first 25kW Generator

DENS and Heijmans tested the Hydrozine generator succesful at Atlas Living Lab in collaboration with Eindhoven University of Technology.

2018 • December

Finishing the X2 prototype

The first version of the X2 prototype which delivers 2 Kw is ready to be tested. DENS continues to the development of a generator that produces 25 kw, which will be commercially available.

2018 • July

DENS founded

Key members of Team FAST are taking the next step by bringing this technology to market by starting DENS. DENS’ reformer technology can eventually replace all combustion engines and can be applied in a wide range of industries. Initially, we focus on developing and building stationary power generators.

2018 • June

A Formic Acid Generator

Team FAST tests the formic acid to power generator for the first time out-door during the reconstruction of the N211 together with the BAM.

2017 • July

Bus concept

Team FAST presents the concept of a 12m VDL bus driving on formic acid. The team never drove the bus while charging since the system was not ready for mobile operation. Later the system was applied stationary during a pilot with the BAM.

2015 • March

Formauto Junior

Six months after Team FAST started, they presented a 1-meter car driving on FA with an output of 25 W.

2015 • January

First proof concept

In 2015, ten students were sparked by nature’s way of capturing the power of the sun with solely water and carbon dioxide. That’s why they formed a team to explore a new energy carrier in which power can be captured: FA. Ten students built a 600 mW car driving on formic acid during their honours project at Eindhoven University of Technology.

2014 • September

Team FAST Foundation founded

Eight of the students from the Honors program founded the student team, Team FAST. Team FAST’s mission: Show the world know this technology on large scale!

2014