How do you replace a diesel generator at your event with a battery?

DENS

At many events, a diesel generator still sits behind the stage: loud, with exhaust fumes among visitors and crew, and usually much bigger than needed. A battery supplies the same power without noise and without local emissions. Sometimes it replaces the generator completely, sometimes it works together with a small grid connection, solar panels or a small generator. In this article you’ll read how that works, how to size the battery, when hybrid makes sense and what to look for when choosing one.

In short

  • A battery powers your event without engine noise and without emissions on site.
  • You size it on two numbers: the peak in kW and the daily use in kWh.
  • If the battery can’t do it all alone, go hybrid: battery plus grid connection, solar or a small generator that only recharges it.
  • At one festival, putting a battery between the generator and the users saved an estimated 50% of diesel.
  • When choosing, look at power, recharging, connections, safety, transport, monitoring and weekend service.

Why replace a generator with a battery?

A generator does its job, but at an event it has a few clear downsides:

  • Noise. A running engine next to a stage, a food truck or a residential area stands out, especially in quiet moments.
  • Emissions on site. Exhaust fumes end up where visitors, artists and crew are.
  • Fuel logistics. Refuelling, storing fuel and topping up during the event take time and attention.
  • Too big for most of the day. A generator is chosen for the peak, but that peak is usually short. The rest of the time it runs at a fraction of its capacity.

A battery has no running engine and no exhaust. It delivers the peak when needed, and otherwise only supplies what’s needed at that moment.

IllustrationGeneratorBatteryHybrid (battery + small generator)
NoiseAudible engine noiseQuiet, no engineQuiet while the battery supplies
Emissions on siteYes, continuouslyNoneOnly while recharging
RefuellingOngoingNot neededMuch less
Handling peaksGenerator must be big enoughBattery supplies the peakBattery supplies the peak
Low load at nightKeeps running at part loadSupplies only what’s neededGenerator mostly off

How does a battery work at an event?

A mobile battery arrives on site charged, or recharges there. From the battery, power runs through your usual distribution boxes to stages, catering, lighting and facilities. When demand jumps, for example when a light show starts or all caterers are frying at once, the battery absorbs that peak.

Recharging can happen in several ways:

  • In advance, at a location with a grid connection, then transported charged to the site.
  • On site, through a small grid connection that is too small for the whole event but can recharge the battery.
  • With solar panels, during the day.
  • With a small generator that only kicks in when the battery drops below a set level.

Fully electric or hybrid?

That depends on the length of your event, your consumption and what’s available on site.

Illustration: situationSmart setup
One-day event, limited useBattery only, charged in advance
Multi-day event with a small grid connectionBattery plus grid connection that recharges at night
Summer event on an open siteBattery plus solar panels
Large multi-day festival without gridBattery plus small generator that only recharges

Hybrid is a full-fledged choice. The generator gets smaller, runs far fewer hours and is switched off during quiet periods. At the Dutch festival Lago Lago, the generator only recharged the battery when it dropped below a set level. The organisers estimated that this saved around 50% of diesel that weekend.

How large should a battery for your event be?

You need two numbers:

  • Power (kW): the highest peak, when everything runs at once.
  • Energy (kWh): the total use per day, or until you can recharge.

Energy (kWh) ≈ average power (kW) × hours until the next recharge

Then add margin for cold weather, a programme that overruns and charging and discharging losses.

Illustration: one-day city eventValue
Highest peak (stage, catering, lighting together)150 kW
Average power over the day60 kW
Duration, including build-up and breakdown12 hours
Energy needed without margin60 kW × 12 hours = 720 kWh
Battery power neededAt least 150 kW

Size on your real peak and daily use, not on the generator that was there last year. That generator was chosen for the busiest moment and says little about what you need the rest of the day.

Do you have metering data from a previous edition, or a list of all connections per stage and stand? Then the calculation is quick. Rather not do the maths yourself? Send us your programme and the list of connections, and we’ll work out which battery fits and how to recharge it.

What should you look for in an event battery?

What to look forWhy it matters
Power and inrush currentsCooling, pumps and some equipment briefly need much more power when starting.
Capacity and rechargingKnow how long you can run and how you recharge during a multi-day event.
Charging and discharging at the same timeThe event carries on while the battery recharges.
ConnectionsDo your existing cables and distribution boxes fit, or do you need extra equipment?
SafetyCheck the local safety guidelines for lithium-ion storage, such as PGS 37-1 in the Netherlands, and common product standards like IEC 62619.
Transport and placementA hooklift system can be set down without a crane, even on a tight site.
Remote monitoringDuring the event you want to see charge level and use live, and step in on time.
Weekend serviceEvents happen when many companies are closed.
Manufacturer, not importerWarranty, parts and expertise come straight from the builder.

Many of these points apply to any mobile battery system. Read more in What should you look for when buying a battery container?

How does DENS power events?

We develop and build our battery systems ourselves, in our own factory in the Brainport region in the Netherlands. For events we use the DENS Powerhub: a mobile battery you set down for each event and take along to the next.

From our projects, to illustrate the range:

DENS Powerhub in practiceStorageFeature
10ft, GOase580 kWh300 kVA continuous, peak up to 600 kVA
10ft, Harderwijk Municipality725 kWhCharges and discharges at the same time, DC charger with two CCS2 cables
Gebroeders Kok1,160 kWhUsed on construction sites, infrastructure and festivals
21ft hooklift, FPH Ploegmakers2.3 MWh300 kVA, fully off-grid, placed without a crane

How that matches the points above:

  • We do the maths. You provide your programme and list of connections, we determine power, capacity and how to recharge.
  • You see everything live. In the DENS portal you follow charge level and use during the event. We monitor remotely and step in before anything stops.
  • We’re always there. Our service team is available 24/7, weekends included, and every system has a QR code for direct contact.
  • Quickly in place. With a hooklift system the battery is set down without a crane.

DENS is a manufacturer, not an importer: the warranty comes directly from us. We are fourth in the Deloitte Technology Fast 50 2026 and the fastest-growing company in the energy sector. With more than 400 projects in more than ten countries, we know what a site really needs. We’re happy to help.

How do others do it?

Dodo festival

DENS powered the Dodo festival. Watch the video to see how it looked.

Gebroeders Kok: no more noise

Gebroeders Kok from Bakkeveen owns a DENS Powerhub of 1,160 kWh and uses it on construction sites, infrastructure projects and festivals.

“No more diesel generators, no emissions, no noise. Just clean, reliable energy without compromising on power or efficiency.” (translated)

Gebroeders Kok
Emission-free equipment of Gebroeders Kok powered by a DENS Powerhub
Gebroeders Kok uses its DENS Powerhub on construction sites, infrastructure and festivals.

PSV: an event at a fixed venue

Not every event moves. At a fixed venue, such as a stadium, a stationary battery fits better. As kick-off approaches, 35,000 fans are on their way in, and lighting, catering and TV production all need power at once. Next to the Philips Stadion, a DENS Gridhub with 300 kVA and 580 kWh absorbs that peak, without generators and without a grid upgrade. Read more about stationary batteries in What is a peak shaving battery and when does it pay off?

Match day at PSV's Philips Stadion in Eindhoven
PSV absorbs match-day power peaks with a DENS Gridhub.

How do you get started?

You can work it out yourself with the steps below, but there’s an easier way: contact us and we’ll take it from there.

  1. List all connections per stage, stand and facility.
  2. Determine your peak and daily use. Use metering data from a previous edition if you have it.
  3. Check what’s on site: a grid connection, space for solar panels, access for transport.
  4. Choose your setup: battery only, or hybrid.
  5. Check your permit and insurance, including local safety requirements for lithium-ion storage.
  6. Plan monitoring and service for the event days.

In short: you provide the programme, we do the rest.

Frequently asked questions about batteries at events

Can a battery fully replace a generator at an event?

Yes, if its capacity matches your use until the next recharge. Otherwise, go hybrid.

Is a battery really quiet?

There’s no engine. At most you hear the cooling, which is far quieter than a generator.

How large should the battery be?

Its power must handle your highest peak. Its capacity is your average power times the hours until you recharge, plus margin. Rather not calculate it yourself? We’ll work it out for you.

How do I recharge the battery during a multi-day event?

Through a small grid connection, solar panels or a small generator that only recharges it.

What is a hybrid setup?

A battery that powers the event, with a small generator that only kicks in when the battery runs low. The generator then runs far fewer hours.

How much diesel does hybrid save?

It depends on your event. At the Dutch festival Lago Lago, the organisers estimated a saving of around 50%.

Which safety rules apply?

That differs per country. In the Netherlands, PGS 37-1 is the guideline for lithium-ion storage. Elsewhere, check local rules and common product standards such as IEC 62619.

Can I use my existing cables and distribution boxes?

Usually yes. Check in advance whether the battery’s connections match your equipment.

What if something goes wrong during the event?

With remote monitoring and a service team available 24/7, a problem is often solved before you notice it.

What is the difference between a Powerhub and a Gridhub?

The Powerhub is mobile and moves from event to event. The Gridhub is stationary, for example at a stadium or event hall.

Sources: NOS on batteries at festivals (Lago Lago, in Dutch) and the customer stories of Gebroeders Kok, PSV and Harderwijk Municipality.